OKF bundle (Open Knowledge Format v2.0.0) — exported from AskMojo.
Scope: public. Concepts: 1.
This file concatenates several concepts (markdown + YAML frontmatter).
Each concept is delimited by a `<!-- FILE: <path> -->` marker.
Import it as-is into Claude / Gemini / any agent: paste this file
as base knowledge. Links between concepts are bundle-relative (/labs/x.md).
-->


<!-- FILE: index.md -->

---
okf_version: 2.0.0
title: OKF bundle — scope public
source: askmojo
scope: public
concept_counts:
  output: 1
---

# OKF bundle (scope `public`)

Open Knowledge Format v2.0.0 bundle — markdown + YAML frontmatter. The AskMojo database stays the source of truth; this bundle is an exported view filtered by scope.

## Concepts

- **output** : 1

## Indexes

- [outputs](/outputs/index.md)


<!-- FILE: log.md -->

---
scope: public
---

# Log

Historique des changements de visibilité / publication (dates ISO).

_Aucun évènement de publication horodaté._


<!-- FILE: outputs/09c01269-6f6f-4aac-9926-d1dd47f79fd7.md -->

---
type: output
title: 8D report CQ-4471, part 774-2210-B
resource: /o/09c01269-6f6f-4aac-9926-d1dd47f79fd7
timestamp: '2026-08-18T08:17:17.071Z'
visibility: public
---

# 8D report CQ-4471, part 774-2210-B

# 8D report CQ-4471

| Field | Value |
|---|---|
| Customer reference | CQ-4471 |
| Part | 774-2210-B, bracket, zinc plated |
| Batch | L-26-0714 |
| Complaint received | 2026-07-29 |
| Report issued | 2026-08-08 |
| Status | D6 verified, D7 in progress |

## D1. Team, 2026-07-30

- M. Aubert, quality manager. Owner of this 8D, D4 analysis.
- J. Ferrand, logistics. Stock hold and quarantine.
- S. Nowak, shift B lead, machine CN-06. Process facts and trials.
- P. Renaud, maintenance. Brush wear measurement and interval revision.

## D2. Problem description, 2026-07-30

Burr on the 8 mm bore of part 774-2210-B, batch L-26-0714. Detected by the
customer on assembly line 3 on 2026-07-29, by hand during fitting. Two operators
were cut and the line stopped 40 minutes. Customer sorting found 61 non-conforming
parts out of 300 checked, a rate of 20 percent, on a delivery of 4 800 parts
shipped 2026-07-16. The burr sits on the intersection of the 8 mm bore and the
top face, height measured at 0.15 to 0.30 mm on our retained samples. The drawing
requires all edges free of burr.

## D3. Containment, 2026-07-30, still running

- 1 240 parts at the customer, 100 percent checked by our sorter on site 2026-07-31, at our cost. 247 non-conforming found and replaced. Sorting records sent per box.
- 2 400 parts of the 2026-07-28 delivery held at customer goods-in, released after sort on 2026-08-01.
- 3 600 parts of our stock quarantined 2026-07-30, sorted 2026-08-02, 690 scrapped.
- 900 parts in work: 100 percent burr check added before packing.
- Next three batches on tightened inspection, 20 parts per box on the bore. Lifted 2026-08-07 once D6 verification was accepted.
- Delivery list checked: no other customer received batch L-26-0714.

## D4. Root cause, 2026-08-06

**Occurrence.** The deburring brush on machine CN-06 was worn to 14 mm against
22 mm new, a 36 percent filament loss, while still inside its seven day
scheduled interval. Trials on retained parts with a new brush produced no burr.
Confirmed. The interval is time based with no wear measurement at change, and it
was set when CN-06 ran a softer part at half the current volume. Part 774-2210-B
moved to CN-06 in March 2026 and the interval was never revisited.

Ruled out, with evidence: bore diameter drift (log ML-26-0714, 8.02 to 8.05 mm
on 8.00 to 8.10, centred), drill wear (tool log CN06-T14, 1 100 parts on a 4 000
part life, within wear limit).

Open: raw material hardness above nominal. Retained coupon not located, so not
tested. Hardness check scheduled 2026-08-14 on the next coil from the same
supplier lot. This branch stays open. It does not affect D5, which addresses the
confirmed causes.

**Escape.** Control plan CP-774-2210 rev C carries no burr characteristic on the
8 mm bore. No inspection could have caught the condition. Confirmed by document
review. Contributing: sampling of 5 parts per box gives roughly a 33 percent
chance per box of catching a 20 percent condition. Inspector conformity to the
plan was checked and is not a cause (record IR-26-0714).

## D5. Corrective actions chosen, 2026-08-06

| Cause | Action | Why this one |
|---|---|---|
| Brush wear inside a time based interval | Move the CN-06 deburring brush to a count based interval of 800 parts, with filament length measured and recorded at every change, reject below 18 mm | Count tracks the wear driver. Time does not, and the volume on this machine has doubled since the interval was set |
| Control plan has no burr criterion | Add a burr characteristic on the 8 mm bore to CP-774-2210, tactile check plus 0.05 mm maximum height, and raise sampling to 20 parts per box | The escape cannot be closed by fixing the machine. Nothing was looking for this condition |

Alternative considered and rejected: a 100 percent automated burr inspection.
Cycle time and cost are out of proportion to a defect that the interval change
removes at source.

## D6. Implemented and verified, 2026-08-07

| Action | Effective | Evidence |
|---|---|---|
| Count based brush interval, 800 parts, wear recorded, 18 mm reject limit | 2026-08-03 | Maintenance plan MP-CN06 rev D. Four changes recorded since, filament at 19 to 20 mm at change, none below limit |
| Control plan burr characteristic and sampling at 20 per box | 2026-08-04 | Control plan CP-774-2210 rev D. Three batches run since, 5 400 parts, 240 parts inspected, zero burr found |
| Operator instruction on burr check at final inspection | 2026-08-04 | Work instruction WI-INSP-77 rev B, four inspectors signed off |

Defect rate on the 8 mm bore since implementation: 0 out of 240 inspected across
three batches, against 20 percent on the claimed batch.

## D7. Prevent recurrence, in progress, due 2026-08-21

- PFMEA for 774-2210-B updated: burr at the bore intersection added as a failure mode, detection ranked against the new control. Document PF-774-2210 rev C, issued 2026-08-07.
- Extended to similar parts: the six other parts running deburring brushes on CN-06 and CN-07 were reviewed. Four had the same time based interval and no burr criterion. Both changes are being applied to all four, due 2026-08-21.
- Lessons learned circulated to methods and maintenance: a consumable interval set for one part does not survive a part change on the same machine. Interval review added to the part transfer checklist, document TC-01 rev B.
- Open item carried from D4: raw material hardness check 2026-08-14. If it returns above nominal, this 8D reopens at D4.

## D8. Closure, 2026-08-08

Disciplines D1 to D6 closed. D7 due 2026-08-21, this report is reissued at D7
closure. Closed by M. Aubert, quality manager. Team recognised at the 2026-08-08
production meeting; S. Nowak located the wear pattern that made the occurrence
branch testable.